Pre-Installation Jobsite Requirements
Carefully examine the flooring prior to installation for grade, color, finish and quality. Ensure adequate lighting for proper inspection. If flooring is not acceptable, contact your distributor immediately and arrange for replacement. Wood Flooring International cannot accept responsibility for flooring installed with visible defects. Prior to installation of any flooring, the installer must ensure that the jobsite and subfloor meet the requirements of these instructions. Wood Flooring International is not responsible for flooring failure resulting from unsatisfactory jobsite and/or subfloor conditions.
Hardwood flooring should be one of the last items installed for any new construction or remodel project. All work involving water or moisture should be completed before flooring installation. Warning – water and wood do not mix. Installing flooring onto a wet subfloor will likely cause cupping and subsequent gapping.
Room temperature and humidity of installation area should be consistent with normal, year-round living conditions for at least a week before installation of wood flooring. Room temperature of 65-75°F and a humidity range of 35-65% is recommended. Warning - humidity levels below 35% will likely cause movement in the flooring, including gapping between pieces and possible cupping and checking in the face.
|